The pre-construction project for the section of the Jing-Tang Railway from Baodi to Tangshan

  • Location:Beijing - Hebei
  • Type:Continuous beam bridge
  • Product:Viscous damper

The newly-built Beijing-Tangshan railway line starts from the Beijing Sub-City Railway Station, passes through Tongzhou District of Beijing, Langfang City of Hebei Province, Baodi District of Tianjin, and Tangshan City of Hebei Province, and ends at the Tangshan Station of the existing Tianjin-Irshenhuo High-Speed Railway. 


The main line is approximately 148.7 kilometers long. According to the construction requirements of the station front engineering, the company supplied viscous dampers. The relevant models and parameters are as follows:

Model 

Damping Force(kN)

Displacement(±mm)

Qty (set)

SFD-1000-250

1000

250

4


Get More Solutions